Contact Lens Multiwell Culture Trays
These contact lens multiwell culture trays are engineered for multiwell lens handling, hydration, inspection and process organization, from early DFM review through repeat production. The molding plan is developed around uniform well arrays and lens positioning, flat tray geometry for automated handling, and smooth cavities that support release and cleaning. Resin selection, gate location, parting lines and inspection points are matched to the mating parts, operating environment and expected production volume.
Product Overview
JingZhan develops custom multiwell trays and related carriers for contact-lens handling, hydration, inspection and process organization. The manufacturing review connects well geometry and array spacing with the customer's instrument, fixture and handling method. A repeated-well design does not by itself establish cell-culture or biological performance. DESIGN AND MANUFACTURING Specify the well count, pitch, depth and base profile together with the outer datums. Confirm the intended contact points and whether the part must fit an existing holder or automated handling system. Review wall balance, ribs and cooling to control distortion across the array. Agree the functional flatness and support conditions used for measurement instead of applying a blanket tolerance. Evaluate flow balance, venting and demoulding of repeated features. Check cavity consistency and any gate or ejector marks against the customer's permitted handling and contact areas. Review clarity, colour, liquid exposure and temperature with the selected grade. Specify any cleaning, surface treatment or contamination requirement separately and agree how it will be verified. TECHNICAL SPECIFICATIONS PRODUCTION AND REPEAT SUPPLY The proposed route combines CNC/EDM toolmaking with injection moulding and feature-appropriate checks. JingZhan's equipment list includes machining, EDM, moulding and vision/dimensional inspection resources. Tool and press selection account for the tray's projected area, repeated features and resin; inspection fixtures reference the agreed support datums. Approve the tray revision, resin, sample and measuring fixture before repeat orders. Define startup and agreed in-process checks for the array and outer interfaces. Review insert replacement, polishing or other tool maintenance that can affect the well geometry before the next batch is released. Tooling investment is quoted separately from the piece price. Share annual demand and release quantities so cavity count, procurement and batch cost can be reviewed together. RELATED APPLICATIONS Organized lens transfer, hydration or inspection under a customer-defined process. Multi-position carriers fitted to laboratory or manufacturing fixtures. Related handling trays supporting small-part separation and repeatable positioning. Culture suitability, surface treatment, liquid compatibility and finished-product performance are project qualification items. No standard well count, working volume or biological claim is assigned to all photographed examples. Discuss your drawing and supply requirements. Send CAD, resin preference, critical features, annual demand and release quantity. Contact our engineering team →Multiwell trays for organized lens handling and processing

Key processing requirements
Define the complete well array
Keep the tray stable
Control filling and release
Match the material to the process

Parameters agreed for your part
Parameter
Project specification
Component scope
Multiwell trays, process carriers and related moulded handling components.
Resin options
PP, PS, PC or COC/COP grades can be reviewed against the intended process.
Well arrangement
Custom count, pitch, depth and base geometry; pictured samples may have different layouts.
Outer interfaces
Customer-defined footprint, support datums, lid fit and fixture interfaces.
Critical checks
Well geometry, array spacing, flatness and drawing-defined handling features.
Surface acceptance
Clarity, colour, flash limits and permitted gate or ejector contact.
Tool configuration
Cavity layout, insert construction, venting and serviceability reviewed during DFM.
Delivery condition
Packing protection and agreed cleanliness, identification and inspection records.

Equipment, lead time and order planning
Planning item
Basis for quotation
DFM review
Indicative 3–5 working days after complete drawings and requirements.
New tooling
Indicative 6–8 weeks to first mould trial after tool-design approval and commercial release; corrections and customer validation are additional.
Order quantities
Initial quotation-planning basis: a 500-piece pilot or 1,000-piece repeat batch per part number, resin and colour, subject to project quotation.
Repeat orders
Indicative 10–15 working days after materials and the production slot are confirmed. Customer qualification, special processing and transit are additional.

Keep repeat orders on an approved baseline
Where these components can be used

Technical Specifications
| Process | Custom precision plastic injection molding |
|---|---|
| Product Group | Contact Lens Multiwell Culture Trays |
| Typical Applications | multiwell lens handling, hydration, inspection and process organization |
| Material Options | customer-specified transparent, packaging or engineering resins selected for lens handling, sealing and release requirements |
| Engineering Focus | uniform well arrays and lens positioning, flat tray geometry for automated handling, and smooth cavities that support release and cleaning |
| Project Support | DFM review, mold design, mold trials, assembly validation and repeat production |
| Customization | Geometry, color, texture, resin, inserts and packaging can be developed to project requirements |
Recommended Products
Explore our high-precision injection moulded components trusted by industry leaders worldwide.